日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
THIS WEEK
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates


Hot Links
China Development Gateway
Chinese Embassies

Beijing-Kowloon Double-track Railway Completed
The last section of the double-track line of the Beijing-Kowloon Railway, one of the major north-south trunk lines in China, was put into operation Friday.

Construction on the Longchuan-Dongguan section of the double-track line, with a length of 220 kilometers, began in March 2001. The project cost a total of 2.698 billion yuan (US$325 million).

The Beijing-Kowloon Railway connects China's capital to Kowloon in Hong Kong. The single line of the railway was put into operation in 1996, but a dramatic surge in the number of passengers and amount of freight has made construction of a double-track a necessity.

(Xinhua News Agency January 11, 2003)

Landslide Suspends Traffic on Beijing-Kowloon Railway
Beijing-Kowloon Double Track Railway to Be Completed Within 2002
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 泸溪县| 日照市| 莱芜市| 浦城县| 衡阳县| 禄丰县| 洛宁县| 行唐县| 茌平县| 凤台县| 大埔区| 宁远县| 吴堡县| SHOW| 伊春市| 福安市| 莲花县| 临武县| 内乡县| 绥棱县| 甘肃省| 娱乐| 山丹县| 南汇区| 宁蒗| 永城市| 阿拉善左旗| 淳安县| 左权县| 察哈| 兴化市| 西乌| 阿拉善右旗| 竹北市| 巴东县| 广州市| 富蕴县| 边坝县| 塘沽区| 新绛县| 长治市|