日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
THIS WEEK
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates


Hot Links
China Development Gateway
Chinese Embassies

Beijing-Kowloon Double-track Railway Completed
The last section of the double-track line of the Beijing-Kowloon Railway, one of the major north-south trunk lines in China, was put into operation Friday.

Construction on the Longchuan-Dongguan section of the double-track line, with a length of 220 kilometers, began in March 2001. The project cost a total of 2.698 billion yuan (US$325 million).

The Beijing-Kowloon Railway connects China's capital to Kowloon in Hong Kong. The single line of the railway was put into operation in 1996, but a dramatic surge in the number of passengers and amount of freight has made construction of a double-track a necessity.

(Xinhua News Agency January 11, 2003)

Landslide Suspends Traffic on Beijing-Kowloon Railway
Beijing-Kowloon Double Track Railway to Be Completed Within 2002
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 福泉市| 南溪县| 宜章县| 德钦县| 大名县| 隆尧县| 祁东县| 工布江达县| 隆子县| 济宁市| 望奎县| 桦南县| 泽库县| 东乌| 淮北市| 洪江市| 阳春市| 万载县| 盘锦市| 灌云县| 平凉市| 阜康市| 江永县| 伽师县| 太湖县| 屯留县| 玉山县| 宝兴县| 嵩明县| 玛纳斯县| 林口县| 舟曲县| 新河县| 简阳市| 荣成市| 阳山县| 七台河市| 宜城市| 孟津县| 和林格尔县| 台南县|