日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
THIS WEEK
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates


Hot Links
China Development Gateway
Chinese Embassies

Beijing-Kowloon Double-track Railway Completed
The last section of the double-track line of the Beijing-Kowloon Railway, one of the major north-south trunk lines in China, was put into operation Friday.

Construction on the Longchuan-Dongguan section of the double-track line, with a length of 220 kilometers, began in March 2001. The project cost a total of 2.698 billion yuan (US$325 million).

The Beijing-Kowloon Railway connects China's capital to Kowloon in Hong Kong. The single line of the railway was put into operation in 1996, but a dramatic surge in the number of passengers and amount of freight has made construction of a double-track a necessity.

(Xinhua News Agency January 11, 2003)

Landslide Suspends Traffic on Beijing-Kowloon Railway
Beijing-Kowloon Double Track Railway to Be Completed Within 2002
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 大方县| 周口市| 资溪县| 西藏| 慈溪市| 南江县| 龙里县| 广昌县| 昌江| 庆阳市| 昌平区| 察隅县| 双柏县| 原阳县| 邢台县| 铜梁县| 临江市| 义马市| 嵩明县| 库伦旗| 应城市| 罗甸县| 若尔盖县| 聊城市| 济阳县| 红原县| 来凤县| 靖西县| 林周县| 蕉岭县| 洱源县| 大悟县| 涞水县| 青海省| 安图县| 阳东县| 中西区| 大丰市| 德钦县| 沛县| 瑞金市|