日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

Beijing-Kowloon Double Track Railway to Be Completed Within 2002

Chinese workers have started to lay rails on the last part of a double track of the Beijing-Kowloon Railway, one of the major north-south trunk lines in China.

The Longchuan-Dongguan section of the double track, with a fulllength of 220 km, began construction in March 2001. The project isexpected to cost 2.698 billion yuan (about US$ 325 million) and will be finished by October 22.

This section of the double track will be ready for service by mid-December.

Beijing-Kowloon Railway connects China's capital city to Kowloon in Hong Kong. The single line of the railway was put into operation in 1996, but the drastic surge in the number of passengers and freight transported on the trunk line has made construction of a double track a necessity.

( People's Daily April 9, 2002)

Railway Projects in Beijing Attract Foreign Investors

Part of China's First Cross-Straits Railway in Operation

主站蜘蛛池模板: 上杭县| 靖宇县| 霍邱县| 瑞安市| 阜平县| 松江区| 尚志市| 泗洪县| 南乐县| 鸡西市| 阿图什市| 科技| 巴林左旗| 松江区| 五峰| 弥渡县| 日土县| 永年县| 色达县| 怀远县| 马边| 临江市| 云和县| 府谷县| 琼中| 安达市| 灯塔市| 余干县| 灯塔市| 晋城| 江孜县| 平南县| 开原市| 房产| 吉林省| 封开县| 白山市| 田阳县| 皋兰县| 蛟河市| 屏边|