日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

Beijing-Kowloon Double Track Railway to Be Completed Within 2002

Chinese workers have started to lay rails on the last part of a double track of the Beijing-Kowloon Railway, one of the major north-south trunk lines in China.

The Longchuan-Dongguan section of the double track, with a fulllength of 220 km, began construction in March 2001. The project isexpected to cost 2.698 billion yuan (about US$ 325 million) and will be finished by October 22.

This section of the double track will be ready for service by mid-December.

Beijing-Kowloon Railway connects China's capital city to Kowloon in Hong Kong. The single line of the railway was put into operation in 1996, but the drastic surge in the number of passengers and freight transported on the trunk line has made construction of a double track a necessity.

( People's Daily April 9, 2002)

Railway Projects in Beijing Attract Foreign Investors

Part of China's First Cross-Straits Railway in Operation

主站蜘蛛池模板: 睢宁县| 永吉县| 共和县| 沙雅县| 广宗县| 东乌珠穆沁旗| 朝阳县| 乐安县| 融水| 乡宁县| 自贡市| 惠水县| 石嘴山市| 溧水县| 平顺县| 长武县| 马公市| 上虞市| 鸡西市| 兰州市| 甘洛县| 海伦市| 轮台县| 莱阳市| 阿坝县| 肥城市| 布拖县| 历史| 临朐县| 新乡市| 柯坪县| 忻州市| 金湖县| 西充县| 碌曲县| 新化县| 平邑县| 密云县| 千阳县| 涟水县| 永昌县|