日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

 

Tibet power grid to link with national network in 2012

0 CommentsPrint E-mail Xinhua, December 2, 2010
Adjust font size:

A multi-billion dollar project to connect the power grid in Tibet to the one in the rest of China will be completed by 2012, ensuring a steady supply of electricity to the plateau region.

The 16.2 billion yuan (2.46 billion U.S. dollars) project includes 900 kilometers of power lines in an area at an average elevation of 4,000 meters above sea level.

Engineers have called it one of the most sophisticated power projects in the world.

The power lines will stretch over 1,000 kilometers from Lhasa in Tibet to Xining City, capital of neighboring Qinghai Province.

Sharing Tibet's power resources with the rest of the country will ease Tibet's power shortages during the winter while generating income for the region in the summer, said Wen Weibing, deputy head of the Qinghai-Tibet Power Grid Linkage Project.

Annual electricity consumption in Tibet is about 1.6 billion kilowatt-hours. The power is mainly generated with hydro-electric power plants.

The power line is expected to transmit 4 billion kilowatt-hours of electricity to Tibet between 2013 and 2015, ensuring smooth power supply to Tibetan industry.

Print E-mail Bookmark and Share

Go to Forum >>0 Comments

No comments.

Add your comments...

  • User Name Required
  • Your Comment
  • Racist, abusive and off-topic comments may be removed by the moderator.
Send your storiesGet more from China.org.cnMobileRSSNewsletter
主站蜘蛛池模板: 偏关县| 会昌县| 鄂托克前旗| 乐清市| 纳雍县| 嘉禾县| 新疆| 双柏县| 肃南| 互助| 望奎县| 博白县| 鲁山县| 雅江县| 阳江市| 蒙自县| 平远县| 丹凤县| 安泽县| 大埔县| 义乌市| 广南县| 庄浪县| 连江县| 万州区| 宝兴县| 青田县| 富阳市| 沙湾县| 兴和县| 汝城县| 阿拉善盟| 江安县| 吉首市| 陆川县| 东城区| 克拉玛依市| 前郭尔| 岫岩| 衡东县| 盐山县|