日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

Home / News Type Content Tools: Save | Print | E-mail | Most Read | Comment
Hydropower Development Plan Set for Lancang River
Adjust font size:

Sources from the annual conference of Hydropower Construction Management Professional Committee under the China Hydropower Engineering Association said China has set the initial hydropower development plan for the Lancang River reaches. By 2020 the Lancang River reach will produce a total of 22 million KW installed capacity.

 

According to the plan, 15 step power stations with a total installed capacity of 25.605 million KW will be built in the Lancang River reaches. Eight step hydroelectric power stations with 9.4 million KW installed capacity and 46 billion KWH annual output will be set up in the upper reaches. Another 7 step power stations with 16.005 million KW installed capacity and 73.7 billion KWH annual output will be built in the middle and lower reaches.

 

Step power stations in the Lancang River reaches have been listed as key bases to activate the “West-to-East” electricity transfer strategy. Relevant authorities started the overall development of the Lancang River reaches from the accomplished Manwan Hydropower Station some years ago.

 

Now, the first phase of Manwan Hydropower Station and Dazhao Mountain Hydropower Station construction has finished. The Xiaowan Hydropower Station with an installed capacity of 4.2 million KW is currently under construction. It’s supposed that the first power-generating unit will be deployed by 2010 and construction finally finished by 2012.

 

Experts pinpoint that overall development confronts many difficulties such as insufficient capital input for packaged projects, over-rapid expenses for restoring forest vegetation and lowered power pricing for the Manwan station. All these difficulties have affected the construction process to some extent. The Lancang River originates in southern Qinghai Province, where its highest tributaries wind down the valleys of the Tanggula Mountains. It enters Tibet Autonomous Region and Yunnan Province and flows out of China from Mengla County of the Xishuangbanna Autonomous Prefecture. The section out of China, called Mekong River, empties into the South China Sea near Hoh Chi Minh City in Vietnam after making its way through Laos, Myanmar, Thailand and Cambodia.

 

(China.org.cn by Alex Xu and Daragh Moller, December 15, 2003)

Tools: Save | Print | E-mail | Most Read
Comment
Pet Name
Anonymous
China Archives
Related >>
- China Opens Major Port on Lancang River
- Yunnan Active in Lancang-Mekong River Region Cooperation
- Millions Invested to Monitor International Rivers
- China to Launch Dredging Project on Lancang River
- Multinational Greater Mekong Program Gears up
- Hydraulic Works on Lancang River not Detrimental to Mekong Ecology: Official
- Xiaowan Dam, A Reservoir for Progress
- New Power Generating Unit in Operation on Lancang River
Most Viewed >>
- World's longest sea-spanning bridge to open
- Yao out for season with stress fracture in left foot
- 141 seriously polluting products blacklisted
- China starts excavation for world's first 3G nuclear plant
- 'The China Riddle'
- Irresponsible remarks on Hu Jia case opposed 
- China, US agree to step up constructive,cooperative relations
- Factory fire kills 15, injures 3 in Shenzhen
- FIT World Congress: translators on track
- Christianity popular in Tang Dynasty

Product Directory
China Search
Country Search
Hot Buys
主站蜘蛛池模板: 田东县| 太原市| 宁化县| 抚宁县| 六盘水市| 平塘县| 绵竹市| 黄梅县| 广河县| 清苑县| 宜昌市| 湄潭县| 彰化县| 临朐县| 平昌县| 开化县| 东宁县| 镇巴县| 文昌市| 大厂| 三门县| 那曲县| 宕昌县| 中牟县| 大悟县| 江北区| 开原市| 保定市| 泗洪县| 景德镇市| 珠海市| 龙州县| 湖北省| 土默特右旗| 萍乡市| 布尔津县| 楚雄市| 高密市| 府谷县| 固原市| 华池县|