日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

 

BP suspends relief work due to bad weather

0 CommentsPrint E-mail Xinhua, August 11, 2010
Adjust font size:

British energy giant BP on Tuesday suspended drilling on a relief well expected to intercept the blown-out well in the Gulf of Mexico due to bad weather.

The suspension would push the interception date, initially expected Thursday or Friday, to sometime between Sunday and next Tuesday, said Thad Allen, the U.S. commander for the oil spill.

Crews had pulled the drilling string out, put a plug in the casing pipe and filled the riser with seawater to make the pipe stay stable, according to Allen.

However, he said the drilling apparatus will remain on the site because the weather was not projected to be very strong.

BP spokesman Max McGahan also said the company stopped drilling because of the weather. "We remain on location, but we've suspended drilling."

The relief well had been drilled down some 17,909 feet below the sea level and was only 30 to 40 feet away from the outside casing of the crippled oil well.

BP aims to permanently seal the leaking well in the Gulf of Mexico with a "bottom kill" after the relief well intercepts it.

The U.S. National Hurricane Center said Tuesday that a low- pressure system off the southwestern coast of Florida was moving west-northwest in the Gulf of Mexico.

The weather system had a 60 percent chance of developing into a tropical depression in the next two days as it moves toward the Louisiana coast, the Center said.

Print E-mail Bookmark and Share

Go to Forum >>0 Comments

No comments.

Add your comments...

  • User Name Required
  • Your Comment
  • Racist, abusive and off-topic comments may be removed by the moderator.
Send your storiesGet more from China.org.cnMobileRSSNewsletter
主站蜘蛛池模板: 镇巴县| 塘沽区| 松阳县| 丰镇市| 岚皋县| 博爱县| 黄骅市| 靖西县| 东乡族自治县| 黄浦区| 中阳县| 柘荣县| 温州市| 襄汾县| 长阳| 柞水县| 永春县| 葵青区| 阜南县| 若尔盖县| 聊城市| 台江县| 奎屯市| 茌平县| 惠州市| 墨玉县| 灯塔市| 依兰县| 股票| 天祝| 临汾市| 陇南市| 万宁市| 盐源县| 赤壁市| 社会| 文成县| 弋阳县| 大港区| 临沭县| 贺州市|