日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

 

BP hits another setback

 
0 CommentsPrint E-mail Xinhua, June 3, 2010
Adjust font size:

BP's latest attempt to contain the gushing oil well hit snags on Wednesday as the diamond-tipped saw to shear off the well pipe became stuck under the sea, the Reuters reported on Wednesday.

NASA MODIS satellite image, taken May 23, 2010, of the Gulf of Mexico shows the extent of the oil released from the Deepwater Horizon spill. The oil can be seen as a sheen on the water surface. [Xinhua]

NASA MODIS satellite image, taken May 23, 2010, of the Gulf of Mexico shows the extent of the oil released from the Deepwater Horizon spill. The oil can be seen as a sheen on the water surface. [Xinhua] 



The company's latest plan is to cut away the leaking riser pipe protruding from the ruptured wellhead on the sea floor.

Then if the remote-controlled saws manage to slice off remaining bits of the pipe and provide a smooth foundation at the top of the well assembly, BP aims to place the containment cap with a rubber seal over the opening to siphon off most of the oil.

The saw had sliced through about half of the pipe when it ran into trouble, and it took BP 12 hours to free it.

The company said preparations were being made to resume cutting, but didn't give a timetable on when it might start. 

Ships work around a barge funnelling some of the leaking oil from the Deepwater Horizon wellhead in this aerial view over the Gulf of Mexico May 18, 2010. [Xinhua]

Ships work around a barge funnelling some of the leaking oil from the Deepwater Horizon wellhead in this aerial view over the Gulf of Mexico May 18, 2010. [Xinhua] 



The latest attempt to control the leak is considered risky and if the strategy fails, the best hope is probably a relief well, which is at least two months from completion.

Since the biggest oil spill in U.S. history began to unfold April 20, crude has contaminated some 125 miles of Louisiana coastline and washed up in Alabama and Mississippi as well.

Over the past six weeks, the well has leaked anywhere from 21 million to 45 million gallons by the government's estimate.

Print E-mail Bookmark and Share

Go to Forum >>0 Comments

No comments.

Add your comments...

  • User Name Required
  • Your Comment
  • Racist, abusive and off-topic comments may be removed by the moderator.
Send your storiesGet more from China.org.cnMobileRSSNewsletter
主站蜘蛛池模板: 阿勒泰市| 古田县| 景德镇市| 盐亭县| 东源县| 东乡| 丹江口市| 大竹县| 扶绥县| 乐平市| 手游| 铁力市| 天水市| 旺苍县| 乳山市| 怀来县| 嘉兴市| 改则县| 开化县| 保康县| 钦州市| 辛集市| 寿宁县| 肥东县| 西乌珠穆沁旗| 武川县| 新巴尔虎左旗| 光泽县| 唐河县| 九江县| 宜章县| 丰镇市| 怀集县| 武平县| 巴马| 双鸭山市| 都江堰市| 宜川县| 含山县| 广安市| 维西|