日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

 

Putin launches turbine at Siberian hydropower plant

0 CommentsPrint E-mail Xinhua, February 24, 2010
Adjust font size:

Russian Prime Minister Vladimir Putin on Wednesday restarted a turbine at a Siberian hydropower plant that was devastated by a disaster last August, Russian news agencies reported.

The catastrophe that killed 75 people at Russia's largest hydropower station, the Sayano-Shushenskaya dam, occurred when a massive surge of water flooded the turbine room.

According to a report released by the state industrial safety watchdog Rostekhnadzor in October, the disaster was caused by technical shortcomings and human errors.

Power generation at the plant was suspended after the deadly accident as three hydropower units were completely destroyed and the remaining seven damaged.

The plant's owner, RusHydro, plans to switch on the second turbine next month and another two by the end of this year. The other six units that were seriously damaged are to be replaced with the new ones.

Putin said the repairs of the hydroelectric plant were to be completed by 2014 and 13.5 billion rubles (US$450 million) would be spent restoring the power plant this year.

"We're planning to allocate 10 billion rubles (US$333 million) for the repairs of the station and 3.5 billion rubles (117 million dollars) for the construction of a spillway," he was quoted by Itar-Tass as saying.

Print E-mail Bookmark and Share

Go to Forum >>0 Comments

No comments.

Add your comments...

  • User Name Required
  • Your Comment
  • Racist, abusive and off-topic comments may be removed by the moderator.
Send your storiesGet more from China.org.cnMobileRSSNewsletter
主站蜘蛛池模板: 都兰县| 普兰县| 白朗县| 布拖县| 康乐县| 宣威市| 竹北市| 霍林郭勒市| 保亭| 营山县| 房山区| 楚雄市| 白玉县| 高青县| 昆山市| 山丹县| 徐闻县| 高碑店市| 奉节县| 苗栗县| 榆社县| 克山县| 霍邱县| 得荣县| 灵山县| 梧州市| 理塘县| 建湖县| 专栏| 贵州省| 淮安市| 华池县| 望城县| 莱西市| 新巴尔虎右旗| 常州市| 合山市| 竹北市| 明水县| 吉隆县| 丁青县|