日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

Home / Travel / News Tools: Save | Print | E-mail | Most Read | Comment
High-speed railway ready to roll
Adjust font size:

Technical know-how

For the Chinese engineers behind the new rail, rolling out the transport marvel goes beyond the basic requirements of speed, comfort and convenience.

"To provide the high-speed rail service, we have had to conquer at least three obstacles," the ministry's Zhang Shuguang said.

The trains' operation control system is one of the core technologies that needs mastering, he said.

Its difficulty lies in getting the trains to keep a safe distance between one another and preventing them from colliding with each other or slower trains, he said, a challenge that may not seem like a big one for slower rail.

"Trains running at 350kmh can equal the speed of airplanes taking off, or at 100m per second," Zhang said.

Only four countries have mastered such technology, he said.

Such expertise has made it possible for the 350-kmh trains to leave the railway station every five minutes during peak hours, and every 10 minutes during non-peak hours, Zhang said.

The second core technology is in synthesizing up to seven rail coordination systems, each with up to 70,000 parts, and making them work as one to maintain track performance, he said. It is something China has also acquired on its own after years of research and experience, he said.

The third core technology of high-speed railways involves the design and manufacture of high-speed trains themselves.

"When a train runs at 350kmh, it will produce an environment of 'negative air pressure'. Designing the high-speed train's air-conditioning system becomes a difficult task, since the train can draw objects into the carriage through any opening, like a big vacuum," he said.

The authorities chose to cooperate with foreign companies that had the necessary expertise, like Germany-based Siemens, to meet such challenges. Under a joint project between the Tangshan Railway Transportation Equipment Company and Siemens, Chinese engineers completed the requisite designs and submitted it to Siemens, who were involved in the industrial certification of the project, Zhang said.

     1   2   3    


Tools: Save | Print | E-mail | Most Read
Comment
Pet Name
Anonymous
China Archives
Related >>
- Newly renovated Tianjin Railway Station
- 24-hour security check in railway stations
- Beijing South Railway Station
- Dead baby found at Guangzhou railway station
Most Viewed >>
- Natural reserves of China through the viewfinder (II)
- Natural reserves of China through the viewfinder (III)
- Swans at Shengtian Lake, Shanxi (II)
- Shijingshan Amusement Park
- Tropical beaches in Sanya
主站蜘蛛池模板: 陕西省| 华安县| 昌都县| 陆川县| 绿春县| 乐山市| 二连浩特市| 乐亭县| 全州县| 绵竹市| 汉川市| 龙州县| 靖州| 增城市| 宣汉县| 达尔| 南郑县| 长沙市| 太仓市| 宁强县| 仪陇县| 青阳县| 拉孜县| 自贡市| 交城县| 崇阳县| 鲜城| 民权县| 都兰县| 常德市| 新和县| 澎湖县| 寿光市| 新宁县| 巴东县| 本溪| 汝南县| 红安县| 韶山市| 福建省| 阳城县|