日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

 

First nuclear power plant in NE China

0 Comment(s)Print E-mail China.org.cn, February 21, 2013
 

In May of 2010, the second phase of the project starts and adds another two sets of one-kilowatt-units, worth an investment of 25 billion yuan. After the completion of the plant in 2016, it will be able to annually generate 45 billion kWh in power. In addition, it will help optimize Liaoning province's power supply structure, realize a better energy conservation, reduce emissions and improve both air and water quality. The second phase consists of installing and testing the engineering equipment, including the proportioning of key equipment, of which 80 percent has been manufactured by China itself. This is the first time a nuclear power plant uses a seawater desalination system to provide fresh water to the Chinese mainland. [Photo/Xinhua]


   Previous   1   2   3   4   5   6   Next  


Print E-mail Bookmark and Share

Go to Forum >>0 Comment(s)

No comments.

Add your comments...

  • User Name Required
  • Your Comment
  • Enter the words you see:    
    Racist, abusive and off-topic comments may be removed by the moderator.
Send your storiesGet more from China.org.cnMobileRSSNewsletter
主站蜘蛛池模板: 泽州县| 神农架林区| 临湘市| 银川市| 桐柏县| 葵青区| 汶上县| 丽江市| 信阳市| 晋城| 神农架林区| 锡林郭勒盟| 金溪县| 上犹县| 唐海县| 介休市| 信阳市| 合阳县| 深圳市| 金山区| 鄂托克旗| 鄂温| 边坝县| 固阳县| 德惠市| 岑溪市| 鹤岗市| 南京市| 邛崃市| 会理县| 潼南县| 静海县| 奈曼旗| 山阳县| 阿克陶县| 青龙| 宜都市| 香河县| 甘泉县| 平谷区| 贡觉县|