日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates
Hotel Service


Hot Links
China Development Gateway
Chinese Embassies
Info
FedEx
China Post
China Air Express
Hospitals in China
Chinese Embassies
Foreign Embassies
Golfing China
China
Construction Bank
People's
Bank of China
Industrial and Commercial Bank of China
Travel Agencies
China Travel Service
China International Travel Service
Beijing Youth Travel Service
Links
China Tours
China National Tourism Administration

Beijing-Kowloon Double-track Railway Completed
The last section of the double-track line of the Beijing-Kowloon Railway, one of the major north-south trunk lines in China, was put into operation Friday.

Construction on the Longchuan-Dongguan section of the double-track line, with a length of 220 kilometers, began in March 2001. The project cost a total of 2.698 billion yuan (US$325 million).

The Beijing-Kowloon Railway connects China's capital to Kowloon in Hong Kong. The single line of the railway was put into operation in 1996, but a dramatic surge in the number of passengers and amount of freight has made construction of a double-track a necessity.

(Xinhua News Agency January 11, 2003)

Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 登封市| 思茅市| 平度市| 康保县| 昌江| 台北县| 吉水县| 大新县| 隆安县| 安义县| 柳林县| 晴隆县| 新乡县| 甘南县| 手游| 开江县| 常熟市| 涟源市| 宝鸡市| 泰兴市| 余庆县| 施甸县| 平利县| 运城市| 万荣县| 镇江市| 喀喇沁旗| 台前县| 邵东县| 龙井市| 南丹县| 陇川县| 吉安市| 吉林市| 花莲县| 潜山县| 罗甸县| 高邮市| 青岛市| 漯河市| 江安县|