日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates
Hotel Service


Hot Links
China Development Gateway
Chinese Embassies
Info
FedEx
China Post
China Air Express
Hospitals in China
Chinese Embassies
Foreign Embassies
Golfing China
China
Construction Bank
People's
Bank of China
Industrial and Commercial Bank of China
Travel Agencies
China Travel Service
China International Travel Service
Beijing Youth Travel Service
Links
China Tours
China National Tourism Administration

Beijing-Kowloon Double-track Railway Completed
The last section of the double-track line of the Beijing-Kowloon Railway, one of the major north-south trunk lines in China, was put into operation Friday.

Construction on the Longchuan-Dongguan section of the double-track line, with a length of 220 kilometers, began in March 2001. The project cost a total of 2.698 billion yuan (US$325 million).

The Beijing-Kowloon Railway connects China's capital to Kowloon in Hong Kong. The single line of the railway was put into operation in 1996, but a dramatic surge in the number of passengers and amount of freight has made construction of a double-track a necessity.

(Xinhua News Agency January 11, 2003)

Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 英山县| 定结县| 华安县| 邻水| 丰台区| 岐山县| 章丘市| 苏尼特右旗| 凤凰县| 额济纳旗| 邵阳市| 昌江| 密山市| 邢台市| 黎城县| 中超| 长阳| 城固县| 通山县| 搜索| 安龙县| 长宁区| 宾阳县| 金华市| 礼泉县| 手机| 浦江县| 永泰县| 弥勒县| 金平| 兴隆县| 呼伦贝尔市| 定日县| 凤山县| 曲周县| 榆中县| 龙南县| 姜堰市| 渭南市| 开平市| 巴彦淖尔市|