日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

Home / Government / Local Governments News Tools: Save | Print | E-mail | Most Read
Checkpoints Renovation Helps Ease Traffic in Shenzhen
Adjust font size:

Shenzhen has recently completed renovation of the Meilin and Nantou checkpoints, easing greatly the traffic congestion at the two checkpoints by widening the road, erecting footbridges and creating different lanes for cargo vehicles and passenger vehicles

The 100 million yuan (US$12.3 million) renovation project was finished on schedule by the end of last year, according to the city's construction authorities.

Besides pedestrian overpasses, bus stations, U-turn lanes and plantings, new toilets were also added at the two checkpoints for the convenience of pedestrians and drivers.

The renovation of the Meilin checkpoint covered an area of 280,000 square meters. It includes 150,000 square meters of road renovation and 130,000 square meters of plantings.

At present, more than 80,000 vehicles pass through the Meilin checkpoint every day. The traffic flow through the checkpoint during peak hours has recorded an annual growth rate of 31.1 percent.

Before renovation, the Meilin checkpoint had three main problems, which were the lack of a bus stop, the poorly planned U-turn lane and the use of the same lanes for pedestrians and vehicles.

With a bus stop and a pedestrian overpass built at the checkpoint, buses have been separated from the rest of traffic to provide more convenience and safety for passengers boarding or getting down from buses.

The U-turn lane at the checkpoint has also been enlarged.

A new pedestrian overpass was built inside the Nantou checkpoint while the old one outside the checkpoint was renovated.

Two bus stops and two U-turn lanes were also added to the Nantou checkpoint to increase the traffic flow.

In recent years, with Shenzhen's rapid economic growth and urban development, an increasing number of large residential compounds have been built outside the special economic zone.

The increase of pedestrian and traffic flow, which caused traffic congestion and jams at the Meilin and Nantou checkpoints, have long plagued the city's residents.

(Shenzhen Daily January 5, 2006)

Tools: Save | Print | E-mail | Most Read

Related Stories
New Border Checkpoint Under Way
New Checkpoint System to Simplify Procedures
Checkpoint Planned in Nan'ao
Begging Forbidden Near Checkpoints
Shenzhen Checkpoints to Face Pressure
?
SiteMap | About Us | RSS | Newsletter | Feedback
SEARCH THIS SITE
Copyright ? China.org.cn. All Rights Reserved ????E-mail: webmaster@china.org.cn Tel: 86-10-88828000 京ICP證 040089號
主站蜘蛛池模板: 秦皇岛市| 浪卡子县| 昆明市| 邵阳市| 盐源县| 吕梁市| 南充市| 沁水县| 鞍山市| 七台河市| 伊春市| 永新县| 仪征市| 新河县| 阿图什市| 博罗县| 陈巴尔虎旗| 资溪县| 蛟河市| 东兴市| 红河县| 鄂尔多斯市| 荣成市| 隆林| 托里县| 余干县| 长垣县| 南澳县| 汕尾市| 安远县| 安仁县| 雷波县| 汝州市| 武宣县| 防城港市| 乌兰浩特市| 安塞县| 平舆县| 于田县| 乌什县| 东乡县|