日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
SPORTS
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates
Hotel Service
China Calendar


Hot Links
China Development Gateway
Chinese Embassies

Online marketplace of Manufacturers & Wholesalers

Key National Projects

The "West-to-East Electricity Transmission," the "West-to-East Gas Transmission," and the "South-to-North Water Diversion" are the government's three key strategic projects, aimed at realigning overall economic development and achieving rational distribution of national resources across China. The "West-to-East Electricity Transmission" project is in full swing, involving hydropower and coal resources in western China and the construction of new power transmission channels to deliver electricity to the east. The southern power grid line, transmitting three million kw from Guizhou to Guangdong, was completed in September 2004. The "West-to-East Gas Transmission" project includes a 4,000-km trunk pipeline running through 10 provinces, autonomous regions or municipalities, conveying natural gas to cities in northern and eastern China. This was finished in October 2004 and has a design capacity of 12 billion cu m per year. Construction of the "South-to-North Water Diversion" project was officially launched on 27th December 2002 and completion of Phase I is scheduled for 2010; this will relieve serious water shortfall in northern China and realize a rational distribution of the water resources of the Yangtze, Yellow, Huaihe, and Haihe river valleys.

In 2003, after a decade of hard work, another key national project --the Three Gorges Dam --began to impound water, opened its permanent locks to navigation and sent power to the grid from its first generating units. It is designed to install 26 sets of generators, each with a generating capacity of 700,000 kw. When fully operational, the annual output of the Three Gorges Power Plant will reach 84.7 billion kw, produced from 26 sets of generators, each set able to meet the needs of a 1,000,000 population city.  

Another key national project, the 1,142 km-long Qinghai-Tibet Railway, the highest railway in the world, will be completed in 2006.

Print This Page | Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 蒙城县| 霍山县| 曲沃县| 浦江县| 合肥市| 赤壁市| 吉安县| 香港 | 华池县| 樟树市| 乌鲁木齐市| 汝南县| 镇康县| 吉安县| 海林市| 察隅县| 乌拉特前旗| 铁力市| 那坡县| 连城县| 金昌市| 太保市| 石台县| 理塘县| 渝中区| 沐川县| 金塔县| 承德市| 分宜县| 仁寿县| 金沙县| 玉林市| 松溪县| 滨海县| 慈利县| 武山县| 汪清县| 灵宝市| 襄汾县| 中山市| 定远县|