日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates
Hotel Service


Hot Links
China Development Gateway
Chinese Embassies

Construction of 2008 Main Stadium to Start in December
The construction of the National Stadium, the main stadium of the Beijing 2008 Olympic Games, will begin on December 24, the stadium's operator announced on Friday.

The Beijing State-owned Assets Management Co. Ltd., the official operator of the National Stadium, told a press conference Friday that they have made concrete plans and timetable to guarantee "the construction work to start as scheduled."

An international design contest was held last December and 14 design enterprises from home and abroad had submitted bids. Three designs will be picked to compete for the final honor.

The 80,000-seat National Stadium, the site of many of the Olympic events, including the opening and closing ceremonies, will be located in the Olympic Green.

(Xinhua News Agency March 15, 2003)

China Holds Design Contest for Main Stadium of Beijing Olympiad
Beijing Organizing Committee for the Olympic Games
New Beijing, Great Olympics
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 壶关县| 任丘市| 长宁区| 大悟县| 祁连县| 久治县| 普兰县| 天等县| 平定县| 东台市| 广州市| 平果县| 二连浩特市| 卓尼县| 曲水县| 灵台县| 阜城县| 德钦县| 上饶市| 卓尼县| 尼玛县| 东山县| 香港 | 漳平市| 东城区| 洪湖市| 喀喇沁旗| 凭祥市| 枣庄市| 江孜县| 赣榆县| 南通市| 精河县| 耒阳市| 中山市| 泗水县| 石泉县| 麻江县| 寻乌县| 侯马市| 南充市|