日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
SPORTS
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates
Hotel Service
China Calendar


Hot Links
China Development Gateway
Chinese Embassies


National Stadium

Project Name: National Stadium

Project Legal Person:
National Stadium Co. Ltd. Established by Beijing State-owned Assets Management Co. Ltd and CITIC Group Federation, the company is mainly responsible for investment, financing, construction, operation and management of the National Stadium; The shareholders of the company consist of Beijing State-owned Assets Management Co. Ltd, which holds 58 percent of shares, and CITIC Group Association, which hold the rest 42 percent, of which 25 percent is foreign investment. It is a Sino-Foreign joint cooperation company approved by the authority.

Project Venues: Locating in the Olympic Green.

Construction Scale:
Construction area will be 258,000 square meters.

Construction Schedule:
The project started construction at the year-end of 2003, it is planned to complete by the end of 2007.

Project Purpose:
Holding opening and closing ceremonies of the 2008 Olympic Games, track and field events etc.

Utilization after Olympic Games:
Undertaking special and important sports events, various routine competitions and non-competition events, a large-scale professional place for the citizens to take part in sports and enjoy sports and cultural recreation. It will be a symbolic sports and recreation building.

Project Progress: The piling construction has been completed.

Procurement Information:
Main building: steels for steel structure, reinforcing steel bars for the concrete structure and commercial concretes.
Strong current: passenger conveyor, freight lift, escalator etc..
Gas power: loaded pressure adjustment devices, turbine compelled manual ball valves, manual ball valves.
Weak current: monitoring system equipments of construction equipments, automatic fire alarming systems, security systems, etc..
Ventilation and air conditioning: duplex mode water-cooling units, ground source heat pump water-cooling units, cooling water pumps etc.
Water supply system: transformer variable frequency conversion life water supply devices, stainless steel life water tanks, external water tank self-cleaned sterilizing equipment etc.

Address: No.1, Huayuan Lu, Beichen Donglu, Chaoyang District, Beijing
Post Code: 100101
Tel: 86-10-8498 6888
Fax: 86-10-8498 8188
Contact Department: Contract Department
Contact Person: Li Cheng

Note: The procurement information was released at the International Forum on the Construction & Operation of Olympic Stadiums held in Beijing on April 18, 2005.

(China.org.cn April 20, 2005)

Print This Page | Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 伊宁县| 建平县| 达孜县| 南郑县| 大兴区| 临江市| 威信县| 延长县| 容城县| 伊金霍洛旗| 剑阁县| 乐陵市| 高雄市| 贺州市| 宁阳县| 汉中市| 瑞安市| 澄城县| 平定县| 合阳县| 滦南县| 汝阳县| 株洲县| 南木林县| 油尖旺区| 海林市| 大安市| 庆安县| 抚松县| 视频| 富蕴县| 手游| 景泰县| 大竹县| 东光县| 武威市| 鞍山市| 中江县| 盐山县| 瑞安市| 习水县|