日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates


Hot Links
China Development Gateway
Chinese Embassies

Three Gorges Downstream Cofferdam Destroyed
Protected by the cofferdams on the main river, the second phase of the Three Gorges Power Project has been under construction since November, 1997, and the demolition of the dam has created conditions for the project's water storage, navigation and power generation in 2003.

In a string of 701 explosions, the downstream cofferdam of the world's largest power project on the Three Gorges of the Yangtze -- disappeared Monday morning.

The 1,075-meter-long downstream cofferdam was blasted away in 9.5 seconds, without damaging the main dam and buildings.

The demolition of the cofferdam was two months ahead of schedule. It has created conditions for the project's water storage, navigation and power generation in 2003.

The cofferdam built in 1997 consisted of two parts, to shield construction of the main structure of the dam. The upstream one was demolished last May.

Protected by the cofferdams on the main river, the second phaseof the Three Gorges Power Project has been under construction since November, 1997.

Construction of the Three Gorges Power Project started in 1993 and is scheduled for completion in 2009.

(Xinhua News Agency July 2, 2002)

Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 琼中| 鄂托克前旗| 探索| 龙游县| 庄浪县| 许昌市| 义马市| 石河子市| 西华县| 儋州市| 临洮县| 巴彦淖尔市| 班戈县| 乌拉特中旗| 宁国市| 会泽县| 马公市| 贵阳市| 德安县| 洮南市| 台北市| 镇安县| 荥经县| 永德县| 威海市| 崇文区| 花垣县| 天长市| 纳雍县| 郑州市| 玉门市| 大城县| 民权县| 涪陵区| 阿城市| 抚顺市| 蕉岭县| 定陶县| 石台县| 垣曲县| 彰武县|