日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

Home / China / National News Tools: Save | Print | E-mail | Most Read
Management of Qinghai-Tibet Railway to Be Improved
Adjust font size:

Chinese Vice Premier Zeng Peiyan said the management of the Qinghai-Tibet railway should be further improved to ensure safe operation and better environmental protection.

Zeng made the remarks at the 10th meeting of the Qinghai-Tibet railway construction group held on July 7 and 8, on which the project of the Golmud-Lhasa section passed national acceptance review.

The railway stretches 1,956 kilometers from Xining, capital of Qinghai, to Lhasa, capital of Tibet, with the project of the 1,142-kilometer Golmud-Lhasa section being built from 2001 to 2006. The Xining-Golmud section was completed in 1984.

Since going into operation in July 2006, the railway had carried 2.6 million passengers and 13 million tons of cargo, going through the test of seasonal changes without serious accidents, said Zeng.

Managing the railway is "more difficult and arduous" than building it, said Zeng, adding that railway departments should improve their services and transportation efficiency.

Safety measures and environmental protection work must be strengthened along the railway.

The opening of the railway should be considered as a rare opportunity for social and economic development of Qinghai province and Tibet Autonomous Region, said Zeng.

Every day, a total of eight passenger trains and two cargo trains run in both directions on the railway, with 960 kilometers of the track being 4,000 meters above sea level and 550 kilometers running over unstable permafrost which is prone to heaving.

Temperatures high up on the Qinghai-Tibet plateau can drop to minus 45 degrees in the winter.

(Xinhua News Agency July 9, 2007)

Tools: Save | Print | E-mail | Most Read

Related Stories
Global Warming Threatens Roof of the World
Qinghai-Tibet Railway Gets Positive Report
Malaysia to Strengthen Tourism Coop with Tibet
Global Warming Raises Tibet's July Temperature
Qinghai-Tibet Railway Marks Anniversary
SiteMap | About Us | RSS | Newsletter | Feedback
SEARCH THIS SITE
Copyright ? China.org.cn. All Rights Reserved ????E-mail: webmaster@china.org.cn Tel: 86-10-88828000 京ICP證 040089號
主站蜘蛛池模板: 蓬安县| 满洲里市| 洪雅县| 新巴尔虎右旗| 濉溪县| 徐水县| 丰县| 杭州市| 越西县| 巴塘县| 巍山| 兴义市| 武宣县| 临清市| 闻喜县| 奈曼旗| 贵州省| 乐山市| 若羌县| 滁州市| 开远市| 依安县| 黄石市| 巨鹿县| 响水县| 木兰县| 抚宁县| 张家口市| 灵石县| 三河市| 长武县| 津市市| 双流县| 侯马市| 积石山| 武汉市| 绥江县| 平定县| 永修县| 揭东县| 读书|