日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

Home / China / Local News Tools: Save | Print | E-mail | Most Read
Shanghai Metro Tests Emergency Measures in Drill
Adjust font size:

An emergency drill was carried out last night at two downtown metro stations.

The drill, at People's Square and Zhongshan Park stations, imitated a large inflow of passengers to People's Square station, with 70 percent of passengers not able to get on to trains.

The station, where Metro lines No. 1 and No. 2 meet, deals with 200,000 passengers on average a day. In yesterday's drill, authorities imitated a malfunction on Metro Line No. 2, causing a pretend 15-minute delay to the line's trains.

Authorities ordered the shutdown of an interchange passage between Line No. 1 and No. 2 at People's Square and another transfer passage at Zhongshan Park, where Line No. 2 connects with Line No. 3.

Metro workers taking part in the drill at People's Square Station told passengers not to come in and handed out refunds for people who had just bought a ticket.

"The drill was to improve our ability to handle emergencies that can happen in the expanding metro networks, especially at interchange stations," said Zhou Huai, general manager of Shanghai Metro Operation Co.

(Shanghai Daily June 23, 2006)

Tools: Save | Print | E-mail | Most Read

Related Stories
Shanghai People Enjoy English Poems in Metro
Shanghai to Have 8 Metro Lines in Operation
Shanghai Booms over Metro Construction
Shanghai, London to Exchange Poems Along Metro Lines
Shanghai Metro Rises Fares to Get More Bus Riders
Shanghai Educates Metro Riders on Safety
 
SiteMap | About Us | RSS | Newsletter | Feedback
SEARCH THIS SITE
Copyright ? China.org.cn. All Rights Reserved ????E-mail: webmaster@china.org.cn Tel: 86-10-88828000 京ICP證 040089號(hào)
主站蜘蛛池模板: 荥经县| 谷城县| 连云港市| 高密市| 江口县| 弋阳县| 安吉县| 安顺市| 常宁市| 曲麻莱县| 垫江县| 黄龙县| 东乡县| 稻城县| 剑川县| 定结县| 五莲县| 偃师市| 福州市| 墨竹工卡县| 合水县| 峡江县| 格尔木市| 申扎县| 乌苏市| 衢州市| 丹阳市| 宁国市| 沂源县| 桂阳县| 通海县| 九江市| 桦川县| 德清县| 新营市| 孙吴县| 陆良县| 遵化市| 湄潭县| 江达县| 义乌市|