日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

Home / China / Local News Tools: Save | Print | E-mail | Most Read
Shanghai Metro Tests Emergency Measures in Drill
Adjust font size:

An emergency drill was carried out last night at two downtown metro stations.

The drill, at People's Square and Zhongshan Park stations, imitated a large inflow of passengers to People's Square station, with 70 percent of passengers not able to get on to trains.

The station, where Metro lines No. 1 and No. 2 meet, deals with 200,000 passengers on average a day. In yesterday's drill, authorities imitated a malfunction on Metro Line No. 2, causing a pretend 15-minute delay to the line's trains.

Authorities ordered the shutdown of an interchange passage between Line No. 1 and No. 2 at People's Square and another transfer passage at Zhongshan Park, where Line No. 2 connects with Line No. 3.

Metro workers taking part in the drill at People's Square Station told passengers not to come in and handed out refunds for people who had just bought a ticket.

"The drill was to improve our ability to handle emergencies that can happen in the expanding metro networks, especially at interchange stations," said Zhou Huai, general manager of Shanghai Metro Operation Co.

(Shanghai Daily June 23, 2006)

Tools: Save | Print | E-mail | Most Read

Related Stories
Shanghai People Enjoy English Poems in Metro
Shanghai to Have 8 Metro Lines in Operation
Shanghai Booms over Metro Construction
Shanghai, London to Exchange Poems Along Metro Lines
Shanghai Metro Rises Fares to Get More Bus Riders
Shanghai Educates Metro Riders on Safety
 
SiteMap | About Us | RSS | Newsletter | Feedback
SEARCH THIS SITE
Copyright ? China.org.cn. All Rights Reserved ????E-mail: webmaster@china.org.cn Tel: 86-10-88828000 京ICP證 040089號
主站蜘蛛池模板: 房山区| 简阳市| 桑日县| 郎溪县| 彭州市| 宿州市| 怀宁县| 利津县| 滦平县| 乌审旗| 阜宁县| 镇坪县| 体育| 汶川县| 盐城市| 台安县| 宁海县| 双牌县| 色达县| 锡林浩特市| 射洪县| 锡林郭勒盟| 宁陕县| 湖口县| 潮州市| 凤城市| 蒙城县| 永平县| 凤翔县| 东方市| 色达县| 金门县| 华容县| 周宁县| 泰兴市| 米易县| 磴口县| 上饶县| 封丘县| 高平市| 瑞昌市|