日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

Tools: Save | Print | E-mail | Most Read
New Hydropower Project on Upper Yangtze
Adjust font size:

The construction of what has been described as China's third largest hydropower project is scheduled to start on the upper reaches of the Yangtze River on Sunday, project sources said Thursday.

With a designed installed capacity of 6 million kilowatts the Xiangjiaba Hydropower Project will be built on the lower reaches of the Jinshajiang River. It's a major tributary of the Yangtze which is the longest waterway in the country, said sources at project headquarters.

According to the plan approximately 88,900 people from three counties of Yunnan Province and three of Sichuan Province will be resettled to make way for the 28.9 billion yuan (US$3.6 billion) project.

The scheme will be capable of generating 30.747 billion kilowatt-hours of electricity annually when completed in 2015.

The Xiangjiaba project is one of a series of hydropower plants China plans to build on the Jinshajiang River in the southwest to supply electricity to its economically more developed coastal regions and boost the resource-rich but poor western area.

Construction of the Xiluodu Hydropower Station, the first such project on the Jinsha River, started last December and is scheduled for completion in 2015.

The Xiluodu project is designed to generate 12.6 million kilowatts of electricity annually. This is next only to the Three Gorges Project, the largest in the world, which is being built on the Yangtze.

The Xiangjiaba and Xiluodu hydropower projects would assist reduce silt problems in the Three Gorges Reservoir, said Zhou Shuangchao, a media center official with the Yangtze River Three Gorges Corporation. They are responsible for these projects. The structures would play a role in flood control, irrigation and navigation on completion, Zhou said.

The Jinshajiang River which is 2,290 kilometers in length originates in Tanggula Range and flows through Qinghai, Tibet, Yunnan, and Sichuan.

Water is mostly stored in the river's middle and lower reaches where China plans to build 12 hydropower stations to share a 59.08- million-kilowatts installed capacity.

Besides the Xiangjiaba and Xiluodu projects the government has also allocated funds for preliminary preparations on the Hutiaoxia (Tiger Jumping Gorge) plant in Yunnan while another at Baihetan is also being considered.

(Xinhua News Agency November 24, 2006)

Tools: Save | Print | E-mail | Most Read

Related Stories
Dam Proposal Rubbished by Critics
Longtan Hydropower Plant Begins Water Storage
New Regulation on Resettlement of Farmers in Reservoir Areas
China to Build Hydropower Stations
Approval for China's 3rd Largest Hydropower Station

Product Directory
China Search
Country Search
Hot Buys
SiteMap | About Us | RSS | Newsletter | Feedback
SEARCH THIS SITE
Copyright ? China.org.cn. All Rights Reserved ????E-mail: webmaster@china.org.cn Tel: 86-10-88828000 京ICP證 040089號
主站蜘蛛池模板: 垫江县| 安塞县| 东丽区| 酒泉市| 罗源县| 遵义市| 黄冈市| 马鞍山市| 玛曲县| 灵寿县| 内黄县| 阳春市| 乐业县| 蓝田县| 尖扎县| 凤翔县| 福安市| 齐河县| 松江区| 即墨市| 明水县| 宜章县| 锡林浩特市| 肃南| 辰溪县| 桓仁| 苏州市| 英山县| 桂平市| 南川市| 肥东县| 宝清县| 香格里拉县| 新竹县| 安溪县| 巩义市| 峨山| 鹿泉市| 贵港市| 奉新县| 临江市|