日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

Tools: Save | Print | E-mail | Most Read
New Hydropower Project on Upper Yangtze
Adjust font size:

The construction of what has been described as China's third largest hydropower project is scheduled to start on the upper reaches of the Yangtze River on Sunday, project sources said Thursday.

With a designed installed capacity of 6 million kilowatts the Xiangjiaba Hydropower Project will be built on the lower reaches of the Jinshajiang River. It's a major tributary of the Yangtze which is the longest waterway in the country, said sources at project headquarters.

According to the plan approximately 88,900 people from three counties of Yunnan Province and three of Sichuan Province will be resettled to make way for the 28.9 billion yuan (US$3.6 billion) project.

The scheme will be capable of generating 30.747 billion kilowatt-hours of electricity annually when completed in 2015.

The Xiangjiaba project is one of a series of hydropower plants China plans to build on the Jinshajiang River in the southwest to supply electricity to its economically more developed coastal regions and boost the resource-rich but poor western area.

Construction of the Xiluodu Hydropower Station, the first such project on the Jinsha River, started last December and is scheduled for completion in 2015.

The Xiluodu project is designed to generate 12.6 million kilowatts of electricity annually. This is next only to the Three Gorges Project, the largest in the world, which is being built on the Yangtze.

The Xiangjiaba and Xiluodu hydropower projects would assist reduce silt problems in the Three Gorges Reservoir, said Zhou Shuangchao, a media center official with the Yangtze River Three Gorges Corporation. They are responsible for these projects. The structures would play a role in flood control, irrigation and navigation on completion, Zhou said.

The Jinshajiang River which is 2,290 kilometers in length originates in Tanggula Range and flows through Qinghai, Tibet, Yunnan, and Sichuan.

Water is mostly stored in the river's middle and lower reaches where China plans to build 12 hydropower stations to share a 59.08- million-kilowatts installed capacity.

Besides the Xiangjiaba and Xiluodu projects the government has also allocated funds for preliminary preparations on the Hutiaoxia (Tiger Jumping Gorge) plant in Yunnan while another at Baihetan is also being considered.

(Xinhua News Agency November 24, 2006)

Tools: Save | Print | E-mail | Most Read

Related Stories
Dam Proposal Rubbished by Critics
Longtan Hydropower Plant Begins Water Storage
New Regulation on Resettlement of Farmers in Reservoir Areas
China to Build Hydropower Stations
Approval for China's 3rd Largest Hydropower Station

Product Directory
China Search
Country Search
Hot Buys
SiteMap | About Us | RSS | Newsletter | Feedback
SEARCH THIS SITE
Copyright ? China.org.cn. All Rights Reserved ????E-mail: webmaster@china.org.cn Tel: 86-10-88828000 京ICP證 040089號
主站蜘蛛池模板: 榕江县| 玉田县| 江城| 千阳县| 柳河县| 沛县| 原平市| 商水县| 华容县| 昌江| 南充市| 永济市| 辽阳市| 威海市| 孟州市| 大关县| 固原市| 肃北| 酒泉市| 蓬安县| 新沂市| 尼玛县| 长宁县| 虹口区| 阿拉尔市| 黄冈市| 永靖县| 新宁县| 屯门区| 东丽区| 云梦县| 临澧县| 桐柏县| 腾冲县| 湾仔区| 马山县| 康平县| 双江| 东平县| 嘉义县| 揭阳市|