日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

Home / English Column / Business (new) / In Industry / Energy Tools: Save | Print | E-mail | Most Read
Power Station to Play Key Role
Adjust font size:

Liu Xiaoyan, assistant manager of a manufacturing firm in Xi'an, capital of Northwest China's Shaanxi Province, never thought that she may one day depend on some strange workers 1,000 kilometers away.

 

But now her concerns over the limited peak hours power supply which hampered her company this summer are being eased by construction workers in far-off Qinghai Province.

 

"Liu won't have to worry about power shortages when our hydropower station goes into operation in 2008," said Lu Zimin, who has been working at the site of the Laxiwa Hydropower Station since April. "Although she doesn't know us, I think our work will help her.

 

"The aim of the Laxiwa Hydropower Station is to adjust power supply in peak hours and play a supporting role in case of accidents on North and Northwest China's power network," said Yang Cunlong, general manager of Laxiwa Hydropower Station Construction Company.

 

"When it is put into operation, it will play a key role in maintaining a good supply for the area."

 

The Laxiwa Hydropower Station, located on the upper reaches of the Yellow River in Guide and Guinan counties, Qinghai Province, will have the biggest yet capacity of all the power stations along the Yellow River, the second-longest river in China, according to Wang Binghua, general manager of China Power Investment Group Company, which is building the station.

 

With investment totalling 14.9 billion yuan (US$1.9 billion), the total installed capacity will be 4,200 megawatts, with an annual average generating capacity of 10.2 billion kilowatt hours, Wang said.

 

According to designers from the Northwest Survey and Design Institute, the use of domestic facilities and materials, the good geological location and introduction of high-tech construction methods for the station's construction meant big savings for investors.

 

The average investment per kilowatt of capacity is only 3,456 yuan (US$432) for this station.

 

Compared with other hydropower stations which can cost 20,000 yuan (US$2,500) for a single kilowatt Laxiwa has very good profit margins, the designers said.

 

After two years of preparation, construction of the station officially began on April 15.

 

Because of rocky surrounding landscape, builders faced a number of difficulties, said Sun Yujun, deputy general manager of the construction company.

 

"The left bank of the dam, currently under construction, is on a rock fracture belt. The traditional construction method would be to cut off all the rocks in order to eliminate the danger of falling rocks, but it would both cost more and take longer," said Sun.

 

Instead builders have fixed the hillside back with awls, steel screening and cement. The designers estimate securing the fracture belt rather than cutting off the rocks saved two years of work and nearly 100 million yuan (US$12.5 million).

 

Behind the power station's 250-metre high dam, Laxiwa Reservoir will contain 1.08 billion cubic metres of water, which will be used to adjust the flow in the upper reaches of the Yellow River and provide water for local farmers. According to Wang Binghua, China's supply of running water, a potential source of clean renewable energy, is the biggest in the world, butt only 25 per cent of possible sources have been used.

 

(China Daily October 11, 2006)

 

Tools: Save | Print | E-mail | Most Read

Related Stories
?
SiteMap | About Us | RSS | Newsletter | Feedback
SEARCH THIS SITE
Copyright ? China.org.cn. All Rights Reserved ????E-mail: webmaster@china.org.cn Tel: 86-10-88828000 京ICP證 040089號
主站蜘蛛池模板: 临泽县| 栖霞市| 普陀区| 西宁市| 万盛区| 龙州县| 鹰潭市| 榕江县| 集贤县| 武陟县| 墨竹工卡县| 互助| 丰城市| 那坡县| 江油市| 广安市| 涪陵区| 贵德县| 迁西县| 维西| 新乐市| 绵竹市| 怀宁县| 井冈山市| 郯城县| 昌吉市| 剑阁县| 交城县| 新龙县| 北票市| 遂宁市| 天峻县| 广灵县| 宜城市| 六盘水市| 岱山县| 内黄县| 高要市| 天柱县| 永川市| 桐柏县|