日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

Home / China / Photos Tools: Save | Print | E-mail | Most Read | Comment
Pudong gateway proves real terminal triumph
Adjust font size:

The state-of-the-art Terminal 2 Building of Shanghai Pudong International Airport was put through its paces Saturday and came through the grueling test with flying colors ahead of its official public opening on March 26.

Shanghai Pudong International Airport's Terminal 2 building is seen in a recent photo. Terminal 2 underwent a mock operation on Saturday.

The comprehensive drill covered all aspects of terminal operations, including passenger boarding checks, quarantine inspections, Customs claims and flight transfers.

Special situations were created, such as passengers taking the wrong luggage or traveling with contraband, and sniffer dogs were also on the case.

About 1,300 college and vocational-school students from the city, with simulated domestic and international flight tickets, played the roles of passengers. A Shanghai Airlines Boeing B767 pulled over to a bridge at Terminal 2 during the exercise to demonstrate landing procedures, including how the crew should leave by the new passages.

The terminal building covers a total area of 480,000 square meters. The top floor serves as the international departures area, the second floor for international arrivals and the ground floor for domestic departures.

International transit passengers who don't need to claim luggage can simply go to any of the nine service desks to complete transfer procedures and then move, via a convenient route, to their departure areas after passing security checks.

As distinct from Terminal 1, the new facility has about 100,000 square meters of high-quality carpet in passenger waiting areas. The carpet reduces noise and helps to make the environment cozy.

Toilets, baby-care rooms and smoking areas are on all floors of Terminal 2, while passengers can only find toilets on the ground floor in Terminal One.

The airport authority said 33 airline-operation centers will be moved from Terminal 1 to Terminal 2 in stages on March 26 and April 29.

Travelers are offered three indoor corridors to walk about 500 meters to transfer between the two terminals or they can take free shuttle buses.

A traffic center, between the two terminal buildings and connected with the three corridors, is ready for service. Travelers will find access to the parking lots at the traffic center, plus the Maglev station.

(Shanghai Daily March 9, 2008)

Tools: Save | Print | E-mail | Most Read
Comment
Pet Name
Anonymous
China Archives
Related >>
Most Viewed >>
主站蜘蛛池模板: 淮阳县| 仲巴县| 鹿泉市| 肃北| 温泉县| 荣昌县| 涞水县| 陇西县| 曲麻莱县| 黄浦区| 乌拉特后旗| 易门县| 穆棱市| 繁峙县| 芜湖县| 西林县| 巴彦县| 冕宁县| 寻甸| 湖南省| 射洪县| 吐鲁番市| 泰宁县| 松江区| 南陵县| 宁安市| 吴江市| 绍兴市| 佛冈县| 师宗县| 天等县| 诸暨市| 深水埗区| 松桃| 武城县| 富平县| 南靖县| 郸城县| 荣昌县| 黄平县| 马尔康县|