日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

Home / China / Local News Tools: Save | Print | E-mail | Most Read | Comment
Three Gorges ship lock reopens after 37 hours
Adjust font size:

Navigation of China's Three Gorges ship lock resumed in both directions at around midday Monday after a 37-hour halt due to foggy weather.

More than 500 passengers on board five ships had been evacuated by 1 p.m. since navigation at the five-tier ship lock resumed at 11:30 a.m., when the fog faded and visibility returned to navigational requirements, the Yangtze River Three Gorges Navigation Bureau said.

Vegetables and grains were given to passengers for food.

About 80 cargo ships out of more than 200 vessels, stranded at the Three Gorges Dam area since the thick fog rolled in late on Saturday, had passed the ship lock by 5:20 p.m., the bureau told Xinhua.

All the remaining vessels were expected to pass through the lock by late Tuesday as each pass took about three hours.

A high pressure, weak wind, continuous rainfall since Saturday, and the special gorge terrain that hampers the diffusion of vapour, jointly contributed the formation of the fog, said Zhou Yuehua, an expert with Hubei Provincial Meteorological Bureau.

Weather forecasters say the sky at the dam area will be clear on Tuesday, but it did not exclude the possibility that fog may reoccur.

It is extremely difficult to forecast foggy weather, especially in the mountainous area, according to Ji Yujian, deputy director of the Three Gorges Navigation Bureau.

The Three Gorges -- the Qutang, Wuxia and Xiling gorges -- extends about 200 kilometers on the upper and middle reaches of the 6,300-kilometer Yangtze, China's longest river.

China launched the Three Gorges hydropower project and water control facility in 1993 with a budget of 22.5 billion U.S. dollars.

A 185-meter-high dam was completed in 2006. The five-tier ship lock was commissioned in 2003.

Workers have so far completed installation of 21 generators. The project's 26 turbo-generators are designed to produce 84.7 billion kwh of electricity a year after its scheduled completion this year.

(Xinhua News Agency, March 18, 2008)

Tools: Save | Print | E-mail | Most Read
Comment
Pet Name
Anonymous
China Archives
Related >>
- 200 vessels stranded at Three Gorges dam
- Heavy fog strands vessels at Three Gorges Dam area
Most Viewed >>
- Foreigners suspended from entering Tibet
- 13 civilians burned or stabbed to death in Lhasa riot
- Tibet official on Lhasa rioting
- Tibet religious figures oppose Dalai Lama's latest remarks
- Dalai's description on Lhasa riot ridiculous
主站蜘蛛池模板: 建始县| 阳谷县| 大埔县| 稻城县| 田东县| 陈巴尔虎旗| 肃北| 富源县| 辽阳市| 南平市| 三穗县| 敖汉旗| 达州市| 綦江县| 昌宁县| 宜城市| 老河口市| 灌阳县| 东乡县| 益阳市| 阜阳市| 松阳县| 喀什市| 靖远县| 大悟县| 福鼎市| 祥云县| 林西县| 十堰市| 绥滨县| 广东省| 河北省| 南召县| 新邵县| 湘阴县| 崇仁县| 化德县| 大化| 余庆县| 南充市| 泰兴市|