日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

 

Three Gorges Dam targets full-capacity run

0 Comment(s)Print E-mail CNTV, September 10, 2011
Adjust font size:

The Three Gorges Dam, the world's largest water control and hydropower project, started collecting water early Saturday in an effort to reach full-capacity by the end of October, said an official with the project.

The dam in central China's Hubei Province is holding water back by discharging less to the lower reaches of the Yangtze River, the country's longest river. The operation could last until the end of October or November, the official said.

The water level had been at 152 meters before the damming began on Saturday, but it will rise by 23 meters over the next two months, he added.

It will be the second time for the reservoir to run at full capacity after its first full-capacity test in October 2010.

Operating at full capacity should give full play to the dam's functions of generating hydroelectric power, delivering water to the lower reaches to alleviate spring droughts, and containing water from summer flooding, as required by the State Flood Control and Drought Relief Headquarters.

The Three Gorges Project was launched in 1993 with a budget equivalent to 22.5 billion U.S. dollars.

Its main components are the dam, a five-tier ship lock, and 26 hydropower turbo-generators. Its key functions include flood control and power generation.

Print E-mail Bookmark and Share

Go to Forum >>0 Comment(s)

No comments.

Add your comments...

  • User Name Required
  • Your Comment
  • Racist, abusive and off-topic comments may be removed by the moderator.
Send your storiesGet more from China.org.cnMobileRSSNewsletter
主站蜘蛛池模板: 十堰市| 石台县| 娄底市| 六盘水市| 施秉县| 巴里| 兴仁县| 大城县| 平乐县| 绩溪县| 日喀则市| 石林| 建德市| 鸡东县| 祁东县| 牡丹江市| 铁岭县| 偏关县| 高清| 会泽县| 铁岭县| 安图县| 和政县| 汉川市| 新河县| 厦门市| 淅川县| 大荔县| 长寿区| 礼泉县| 洛宁县| 平果县| 武隆县| 绥江县| 泰顺县| 铁力市| 监利县| 孟村| 遂溪县| 石狮市| 洛扎县|