日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

 

New hydropower station begins operation in Tibet

0 Comment(s)Print E-mail Xinhua, June 17, 2011
Adjust font size:

A new hydropower station became operational Friday in southwest Tibet Autonomous Region, as a first step to build a clean energy base in the plateau region.

The Laohuzui -- which translates into "tiger's mouth" -- hydropower station in Gongbo Gyamda County of Nyingchi Prefecture, about 343 km from Tibet's capital Lhasa, is designed to generate 2.5 million to 2.6 million kilowatt-hours of electricity daily to supply Lhasa.

Construction began in 2007.

The 1.288 billion yuan (US$200 million) project has an installed capacity of 102 megawatts, said Ponwa, a deputy official in Nyingchi.

Several other hydropower stations have been built in Nyingchi Prefecture, including the 722.6-million-yuan, 40,000-kilowatt Xoka hydropower station, and the 25-billion-yuan, 3.78 million-kilowatt Songta hydropower station.

Nyingchi Prefecture has 77,000 hectares of rivers and lakes and at least 60 million kilowatts of hydropower reserves.

Print E-mail Bookmark and Share

Go to Forum >>0 Comment(s)

No comments.

Add your comments...

  • User Name Required
  • Your Comment
  • Racist, abusive and off-topic comments may be removed by the moderator.
Send your storiesGet more from China.org.cnMobileRSSNewsletter
主站蜘蛛池模板: 尚义县| 宜君县| 牡丹江市| 丹寨县| 同心县| 孙吴县| 肇东市| 疏附县| 涿鹿县| 清水县| 乳山市| 邛崃市| 齐齐哈尔市| 漳平市| 秦皇岛市| 柳州市| 恭城| 德州市| 隆昌县| 高清| 桐梓县| 泗洪县| 衡东县| 皋兰县| 尉犁县| 镇原县| 和硕县| 香港| 启东市| 高青县| 商丘市| 阳泉市| 呼图壁县| 临夏市| 福建省| 锡林浩特市| 遵化市| 旌德县| 榕江县| 城固县| 和林格尔县|