日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

 

New hydropower station begins operation in Tibet

0 Comment(s)Print E-mail Xinhua, June 17, 2011
Adjust font size:

A new hydropower station became operational Friday in southwest Tibet Autonomous Region, as a first step to build a clean energy base in the plateau region.

The Laohuzui -- which translates into "tiger's mouth" -- hydropower station in Gongbo Gyamda County of Nyingchi Prefecture, about 343 km from Tibet's capital Lhasa, is designed to generate 2.5 million to 2.6 million kilowatt-hours of electricity daily to supply Lhasa.

Construction began in 2007.

The 1.288 billion yuan (US$200 million) project has an installed capacity of 102 megawatts, said Ponwa, a deputy official in Nyingchi.

Several other hydropower stations have been built in Nyingchi Prefecture, including the 722.6-million-yuan, 40,000-kilowatt Xoka hydropower station, and the 25-billion-yuan, 3.78 million-kilowatt Songta hydropower station.

Nyingchi Prefecture has 77,000 hectares of rivers and lakes and at least 60 million kilowatts of hydropower reserves.

Print E-mail Bookmark and Share

Go to Forum >>0 Comment(s)

No comments.

Add your comments...

  • User Name Required
  • Your Comment
  • Racist, abusive and off-topic comments may be removed by the moderator.
Send your storiesGet more from China.org.cnMobileRSSNewsletter
主站蜘蛛池模板: 宿州市| 光泽县| 仪陇县| 琼结县| 星子县| 观塘区| 雷山县| 信阳市| 界首市| 新余市| 浦江县| 徐水县| 前郭尔| 东乡族自治县| 双桥区| 神农架林区| 韩城市| 沙坪坝区| 通州市| 同仁县| 隆化县| 鄱阳县| 天水市| 汕尾市| 那曲县| 昌都县| 杂多县| 昌都县| 正宁县| 扎囊县| 旬邑县| 荥经县| 益阳市| 霍林郭勒市| 乐昌市| 霍林郭勒市| 聂拉木县| 平度市| 邢台市| 郴州市| 岑巩县|