日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

 

Water from Hebei quenches Beijing thirst again

0 CommentsPrint E-mail China Daily, May 26, 2010
Adjust font size:

Sluices were lifted up once again on Tuesday in three reservoirs in Beijing's neighboring Hebei province to channel water to the capital through the Beijing-Shijiazhuang section, an emergency part of the South-to-North Water Diversion project, for ensuring the city's water supply.

It will take about 10 days for 200 million cubic meters of water to flow into Beijing, sources said, adding that the supply would last until November.

This is the second time water from Hebei has been used as a stopgap for shortages in Beijing since the 307-kilometer-long canal was put into use in Sept 2008. Completion of the entire central is scheduled for 2014.

The canal supplied up to 435 million cu m of water to Beijing for months in 2008, 65 percent of the total Beijing needed to meet its minimum demand for urban residents in its worst water shortage season.

Since then, the water it has brought into Beijing amounts to roughly one-third of the city's total everyday water needs. With the borrowed water, Beijing has reduced its exploitation of ground water, which has decreased land subsidence.

After years of delay, construction on SNWD is proceeding at full capacity, thanks to an unprecedented investment boom.

Since then, authorities have been busy with two key factors challenging the project – the 540,000 people to be relocated, including 330,000 of them from Hubei and Henan provinces, and serious industrial wastes around its eastern route.

To date, more than 23,000 people have been moved along the central route, while construction of 426 pollution-control projects have begun on the eastern route.

The SNWD project, an effort that will take at least 40 years to complete, was designed to bring water from the water-rich Yangtze River basin to the parched north, along three canals each stretching more than 1,000 km. The diversion will ultimately connect the country's Yangtze, Huaihe, Yellow and Haihe rivers via three water-diversion channels. Construction of the eastern route began in December 2002 and construction of the first phase of the central route began a year later.

The western route, meant to replenish the Yellow River with water diverted from the upper reaches of the Yangtze River, is still on the drawing board.

According to SNWD's office, the first phase of the eastern route will begin to provide water in 2013, and the central canal is expected to begin providing water in 2014.

Print E-mail Bookmark and Share

Go to Forum >>0 Comments

No comments.

Add your comments...

  • User Name Required
  • Your Comment
  • Racist, abusive and off-topic comments may be removed by the moderator.
Send your storiesGet more from China.org.cnMobileRSSNewsletter
主站蜘蛛池模板: 大理市| 天全县| 剑河县| 江川县| 徐水县| 龙口市| 汉中市| 志丹县| 绥棱县| 镇安县| 沙坪坝区| 尤溪县| 沙坪坝区| 济阳县| 海安县| 永安市| 德昌县| 汉源县| 大宁县| 息烽县| 浮梁县| 东丽区| 措美县| 尤溪县| 勐海县| 恭城| 祁东县| 来凤县| 景泰县| 同德县| 浮梁县| 延吉市| 壤塘县| 西青区| 黄浦区| 行唐县| 文成县| 白城市| 清新县| 海伦市| 铅山县|