日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

 

Backgroud information about quake-hit Yushu

0 CommentsPrint E-mail China.org.cn, April 17, 2010
Adjust font size:

I. General Conditions of Roads to Yushu quake-hit areas

There are roads connecting the Yushu quake-hit areas in 4 directions:

To the north, , the main corridor for rescue operations, from Xining via Gonghe and Maduo to Yushu via G214, total length 820km, 2nd Class Highway with 66 bridges;

To the south, from Changdu, Tibet to Yushu via G214, total length 450km, 3rd Class Highway with 83 bridges;

To the east, from Ganzi, Sichuan via G317, S217, S308 and G214 to Yushu, total length 496km, 3rd and 4th Class Highway with 58 bridges.

To the west, form Budongquan via Qumalai and Zhiduo to Yushu, total length 557km; mainly 3rd and 4th Class Highways.

For the time being, all these roads are in sufficient conditions for rescue operations. The latest conditions of the roads are as follows:

1. North Line (G214):

Xining-Jiegu: in sufficient conditions;

Yankoushan-Jiegu: landslides mass has been removed, while cracks have been found in a number of bridges and culverts; and on Huashixia Bridge, Maduohuanghe Bridge and Tongtianhe Bridge, only one vehicle with limited speed is allowed to pass by once time.

2. South Line:

Jiegu-Yushu Airport: landslides mass at a number of sections has been removed and the road is in sufficient conditions for traffic.

3. East Line:

In Sichuan, Shiqu-Xiew-Jiegu (S217): in sufficient conditions for traffics;

In Qinghai, Anbalashan Pass (S308): in sufficient conditions for traffics.

4. West Line:

Duolamakang-Zaduo(S309): in sufficient conditions for traffic, with still scattered landslides along the road; road maintenance teams are trying to restore the traffic and examining the bridges and culverts.

Budongquan-Qumalai (S308): in sufficient conditions for traffics.

Qumalai-Zhiduo (S308): subgrade of various sections is twisted out of shape, while mountain-rounded sections are unsuitable for traffics.

Zhiduo-Jiegu (S308): traffics are restored, with subgrade sinking, pavement cracks and landslides at interrupted parts along the over 100km road section; road maintenance teams are trying to restore the traffic; detours were build at some landslide sections and accessible to large vehicles; the landslide mass are expected to be removed completely by 17th April.

1   2   3   Next  


Print E-mail Bookmark and Share

Go to Forum >>0 Comments

No comments.

Add your comments...

  • User Name Required
  • Your Comment
  • Racist, abusive and off-topic comments may be removed by the moderator.
Send your storiesGet more from China.org.cnMobileRSSNewsletter
主站蜘蛛池模板: 义马市| 沙湾县| 安仁县| 西贡区| 威信县| 浦城县| 方城县| 游戏| 承德县| 宜阳县| 黔西县| 岑溪市| 威宁| 赤城县| 喀喇| 湘阴县| 赤水市| 沁阳市| 龙胜| 贺州市| 广河县| 浦城县| 阳山县| 奉化市| 澄江县| 湟源县| 迭部县| 峨眉山市| 松江区| 永定县| 庐江县| 永定县| 丰镇市| 富源县| 修文县| 石楼县| 镇巴县| 嵊州市| 雷山县| 东阳市| 金湖县|