日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

share
 

Installed non-fossil fuel power capacity reaches 2B kilowatts

0 Comment(s)Print E-mail Xinhua, March 28, 2025
Adjust font size:

An aerial drone photo taken on Jan. 8, 2025 shows an offshore photovoltaic power project in the waters of Zhaoyuan City, east China's Shandong Province. [Photo/Xinhua]

China's installed non-fossil fuel power generation capacity surpassed 2 billion kilowatts for the first time at the end of February, according to the latest data released by the China Electricity Council.

The figure accounted for 58.8 percent of the country's total installed power generation capacity.

The installed capacity of new energy generation, represented by wind and solar power, reached 1.46 billion kilowatts at the end of last month, accounting for 42.8 percent of the country's total power generation capacity.

Official data showed that China's installed capacity of non-fossil fuel power generation surpassed 1 billion kilowatts for the first time at the end of June 2021.

The quick increase in the installed capacity reflected the power sector's continued efforts to optimize the energy structure and accelerate the green and low-carbon transition.

Follow China.org.cn on Twitter and Facebook to join the conversation.
ChinaNews App Download
Print E-mail Bookmark and Share

Go to Forum >>0 Comment(s)

No comments.

Add your comments...

  • User Name Required
  • Your Comment
  • Enter the words you see:   
    Racist, abusive and off-topic comments may be removed by the moderator.
Send your storiesGet more from China.org.cnMobileRSSNewsletter
主站蜘蛛池模板: 寻甸| 石林| 潢川县| 南华县| 文山县| 肇源县| 托里县| 双辽市| 龙川县| 通许县| 靖西县| 广水市| 天等县| 黄骅市| 宁国市| 哈尔滨市| 大名县| 隆子县| 松溪县| 天峻县| 昌邑市| 库尔勒市| 黄浦区| 汤阴县| 杭州市| 中牟县| 盐亭县| 九寨沟县| 铜川市| 会昌县| 蕉岭县| 巴中市| 南靖县| 灵石县| 博湖县| 巴彦县| 师宗县| 海宁市| 宿松县| 普定县| 那曲县|