日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

Home / Business / Energy Tools: Save | Print | E-mail | Most Read | Comment
China's coal-to-liquids projects buffeted by changing policy, economic environment
Adjust font size:

Yanzhou began work on a 1 million-tonne indirect CTL plant in February 2006 in Yulin City, Shaanxi Province. It has conducted environmental reviews and is awaiting approval from the National Development and Reform Commission, China's top planning agency. The Yanzhou project would have two stages, each with annual output of 5 million tonnes, the group said.

Also, about 10 provinces or autonomous regions, including Xinjiang, Shandong, Shaanxi, Guizhou and Ningxia, are planning CTL projects.

Taking all these plans into account, industry analysts estimate China will have an annual CTL capacity of 30 million tonnes to 50 million tonnes in 2020.

WORLD CONDITIONS CHANGE

However, oil prices are far off their mid-2008 highs, hovering at about 50 U.S. dollars per barrel now, and lower prices can change the economic environment of these capital-intensive projects.

To reduce the risk of having excessive, uneconomic capacity, the NDRC announced policies as early as 2006, banning projects with annual output below 3 million tonnes. In September 2008, the NDRC followed up with a circular, ordering a halt to almost all projects except for the Shenhua Group's direct CTL project and an indirect CTL plant proposed in northwest China's Ningxia.

The directive, combined with the impact of the global financial crisis, cooled enthusiasm for many CTL projects in China. However, Yitai Group and Lu'an managed to keep their projects on the list.

NEW ECONOMIC REALITIES

According to Li Yongwang, it takes 3.5 tonnes of coal to produce 1 tonne of oil under the direct process and 4.02 tonnes under the indirect process, at least in the pilot projects.

However, it's not just oil prices that have changed. Domestic coal prices have doubled since some of the pilot programs got under way, meaning that CTL project costs have also surged. Li said the higher coal price would make it tough for many CTL projects to be profitable.

Based on current coal prices, the costs of an indirect CTL plant would be about 50 U.S. dollars per barrel. Larger production scales and better technology could, in time, help reduce the volume of coal needed. In that case, the cost might fall closer to 40 U.S. dollars per barrel, said Li.

DOWNTURN WON'T LAST

Zhao said he still believed in the future of the CTL industry.

"It is widely acknowledged that oil prices will rise again in the long term, because oil is a strategic resource," said Zhao.

He added: "Chinese companies building coal-to-oil projects are strong, with large coal reserves, and they can be competitive. If they can increase their economies of scale and extend their production chains to produce higher value-added products such as ethylene, the coal-to-oil projects have a good chance to be profitable."

(Xinhua News Agency April 6, 2009)

     1   2   3  


Tools: Save | Print | E-mail | Most Read Bookmark and Share
Comment
Pet Name
Anonymous
China Archives
Related >>
- China plans to double natural gas output by 2015
- China's 1st 100-mln-tonne coal base on stream
- Is it the end of the line for coal-to-oil in China?

Mar.20, Shanghai Lipper Funds Awards
Mar.21-22, Beijing Anti-monopoly Law Symposium
Mar.27, Beijing The 4th Annual China Fund Summit
Apr.11-12, Beijing The Fifth (2008) 'Gold Prize of Round table'of Chinese Boards of Listed Company
Apr.20-23, Beijing Green Transformation: Forcast New Business Culture

- Output of Major Industrial Products
- Investment by Various Sectors
- Foreign Direct Investment by Country or Region
- National Price Index
- Value of Major Commodity Import
- Money Supply
- Exchange Rate and Foreign Exchange Reserve
- What does the China-Pakistan Free Trade Agreement cover?
- How to Set up a Foreign Capital Enterprise in China?
- How Does the VAT Works in China?
- How Much RMB or Foreign Currency Can Be Physically Carried Out of or Into China?
- What Is the Electrical Fitting in China?
主站蜘蛛池模板: 革吉县| 井冈山市| 浮山县| 津南区| 宁化县| 韩城市| 武冈市| 洞头县| 西畴县| 无为县| 武义县| 靖安县| 成都市| 青川县| 镇宁| 荔波县| 内江市| 乌兰浩特市| 文水县| 塘沽区| 连云港市| 潞西市| 辽源市| 大名县| 神池县| 兴文县| 宁河县| 贺兰县| 收藏| 隆安县| 太仓市| 蒙城县| 镇远县| 瓦房店市| 南皮县| 伊金霍洛旗| 淳化县| 吴忠市| 株洲县| 家居| 大关县|